Navigation

    Community

    • Register
    • Login
    • Search
    • Categories
    • Recent
    • Popular
    • Users
    • Search

    Links with cable-import doesn't work with Power Consumer

    Operating
    2
    2
    27
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • S
      sbaas_keylane last edited by

      Oke. How does the linking to other object work? Because linking to Power Consumer doesn't work. Can you help troubleshoot.

      What I done is creating a new switch object. Then created two Power Consumer object with title PSU1 and PSU2. The I checked the documentation for Cabling import module https://kb.i-doit.com/display/en/Cable+patches+and+paths
      For information the power-object is the first object in my CSV and the switch is de last object in my object. So >
      PowerUnit1;Outletxx;CableXX;PSU1;Switch;PSU1
      PowerUnit2;Outletxx;CableXX;PSU2;Switch;PSU2

      Then after importing this was the result.
      df7fc18b-694a-420f-8464-6f689f35699d-afbeelding.png

      1 Reply Last reply Reply Quote 0
      • Philipp Hörselmann
        Philipp Hörselmann i-doIT Team last edited by

        Hey @sbaas_keylane
        based on this picture the connection between PSU1XXXXX03 and Outlet06 is created. In this case I would say, it worked fine.
        If this is not the desired result, I would appreciate you to describe this more detailed.
        Thanks in advance

        Cheers,
        Phil

        1 Reply Last reply Reply Quote 0
        • First post
          Last post